|
|||||||||||
THE TRANSMISSION GALLERY
STOCKLAND HILL
Photos by Babcock Networks Ltd., Martin Watkins and mb21
On these pages we will give you some idea of the work involved in updating a high power main station in the run-up to digital switchover.

The new reserve aerial is being winched up...





Inside the new reserve aerial





There's not too much room to work...





The old reserve aerial is taken down



And here we see the new reserve aerial in place, fully wired and operational. Note also the temporary aerial installed for Gemini FM, which can be seen at the bottom of the last photo here.
Next >
Back to TX Gallery index | TX main index
| |
|