|
|||||||||||
THE TRANSMISSION GALLERY
BETHESDA
| Photos by Martin Brown | Page last updated: 2022-08-10 |
| Ahead of 700 MHz band clearance a new receive panel aerial was installed at Bethesda in April 2018. This a consequence of the channel changes implement at the parent station Llanddona on 14-Nov-2018. From the same date Bethesda was converted from an active deflector to a transposer relay. |


| Both trough receive aerials have been replaced with this single panel. |


| From the discolouration, these must be the transmit panels installed for DSO in 2010. |



| The service area. |
| |
Back to TX Gallery index | TX main index
|