![]() |
|
![]() |
|||||||||
![]() |
THE TRANSMISSION GALLERY
PYE GREEN (BT)
Photos by Jack Richardson | Page last updated: 2023-11-06 |
Since my previous photos in July 2022, it seems like the structural work is near enough complete. The FM and DAB antennas have been moved back to the top of the tower, but the spine holding the crane has been removed, leaving the broadcast antennas on a separate metal tower. |
The metalwork on the right was used to support the broadcast antennas during the works. |
The FM antenna has been moved back to mixed polarization! |
The DAB cabin |
|
Back to TX Gallery index | TX main index
|