![]() |
|
![]() |
|||||||||
![]() |
THE TRANSMISSION GALLERY
OXENHOPE
Photos by Martin Brown | Page last updated: 2022-10-11 |
The Keighley receive trough aerial has been replaced with a panel due to 700 MHz clearance channel changes. |
The new receive panel aerial pointing towards Keighley. The embossing on the front is that of antenna manufacturer Sira. |
No change to the transmit aerial system. |
The Emley Moor receive trough remains in situ, although not used for many years. |
|
Back to TX Gallery index | TX main index
|